  • Another great day - we finished the septic tank by forming a concrete lid, complete with stench pipe & inspection hatch and then we started to felt, batten & tile one side of the roof. The temperature was again mid 30's and with the reflection from the roof felt it was hot, hot.

    We left the lodge at 7.15am and got backat 6.45 BUT we completed one side of the roof complete with the name of the school picked out in red roof tiles.

    Tomorrow is my last full day but  we hope to complete the roof! 